GM Orion BET #2 & ASRS

This Battery Assembly building and ASRS is a Design build project that we did with Walbridge for GM. We started this project in 2022 and is projected to be completed by July of 2025. This (2) Level Battery assembly is an expansion of the existing plant. We installed (2) substation rooms along with a network of power […]