DTE SIBLEY QUARRY SITE IMPROVEMENTS
To begin this project, our team designed and built (2) Power Distribution Containers (PDC) in our prefabrication dept, with the help of our engineering team. The PDC’s distribute power to (4) 200HP pumps to control infiltration of ground water. The pumps are controlled with the latest in SCADA technology and can be operated remotely by phone or computer. The quarry is being filled with fly […]