Connect with us

Talk to an expert   248.585.3400
EMERGENCY
810.533.5594

EMERGENCY
810.533.5594

SE News

Superior Electric Acquires Tri-County Electric

In May of 2023, Superior Electric Great Lakes Company officially acquired Tri-County Electric, located in Saline, Michigan, servicing the Ann Arbor area. Tri-County Electric started in 1971 as a residential...

SEGLC Awarded Detroit Free Press Top Workplaces for Small Sized Companies

Superior Electric Great Lakes Company is proud to have received recognition for the Detroit Free Press Top Workplaces for small-sized companies. During the process for this recognition, SEGLC scored 91%...

Superior’s Video Wall Carts at GM Tech Center’s EV Display

In 2020, General Motors tasked Superior’s A/V division (headed by Steve Alicea) with designing and creating some video wall carts for the electric vehicle display at the Global Tech Center. Our work was then featured...

CIO Sam Rozenberg Featured in Crain’s Magazine

Sam and his co-founder, Paul Vlasic, recently helped develop a web-based platform for nonprofits that was featured in Crain’s magazine. The platform is called Share Detroit. Share Detroit was created...

Tennessee Valley Featured in Electrical Contractor Magazine

Our Tennessee Valley team was recently featured in Electrical Contractor Magazine, which highlighted a roundup of prominent Nashville projects. Superior Electric Tennessee Valley employees Richard Vik and Kyle Dye were interviewed and...

SEGLC Recognized for Outstanding Safety

A special thank you to our Superior team (the safety department, the field, and project management) for your commitment to safety as a culture. Congratulations to all involved in these three...

Superior Electric Acquires the Nashville, Tennessee division of BESCO

We are pleased to announce that Superior Electric Great Lakes Company has officially acquired the Nashville, Tennessee division of BESCO as of June 28, 2020. This division of BESCO has...

General Motors DMAX Brookville, Ohio Project

“Work at GM Brookville is coming to a close. This project utilized various lean practices and methods to deliver the customer a project that met all of their design criteria,...

Factory ZERO Equipment Installation

SEGLC is currently working on the equipment installation at Factory ZERO. The new reconfigured manufacturing facility in Detroit-Hamtramck will produce all-electric vehicles. SEGLC is proud to be a part of GM’s #EV journey!  WATCH VIDEO

...

Connect with us

CLOSE