Connect with us

Talk to an expert   248.585.3400
EMERGENCY
810.533.5594

EMERGENCY
810.533.5594

PENTHOUSE SUB

Building Facilities to include MV Distribution, Unit Substation installation, 480/277v & 208/120v Branch Circuit Distribution, Fire Alarm installation and General-Purpose lighting. Paint Process installation to include Paint Booth Lighting and Robotic wiring, Oven power and controls, and repair deck lighting and power.

GM DETROIT HAMTRAMCK FACTORY ZERO

Summary: This project is a Brownfield project, complete demolition to building steel. We are nearing completion of a complete rework of power distribution, lighting, and fire alarm systems in the facility. With the largest portion of the facility work behind us, we are well under way on the installation of a completely new paint process […]

Superior’s Video Wall Carts at GM Tech Center’s EV Display

In 2020, General Motors tasked Superior’s A/V division (headed by Steve Alicea) with designing and creating some video wall carts for the electric vehicle display at the Global Tech Center. Our work was then featured in the main photo on the Yahoo News article detailing GM’s 13 electric vehicles on display. To read the article about GM’s push towards electric and […]

CIO Sam Rozenberg Featured in Crain’s Magazine

Sam and his co-founder, Paul Vlasic, recently helped develop a web-based platform for nonprofits that was featured in Crain’s magazine. The platform is called Share Detroit. Share Detroit was created to connect Detroit nonprofits to both donors and volunteers. In addition, the nonprofits who set up a page on the site can promote their events […]

Connect with us

CLOSE