In 2021, Superior performed a basement buildout and some general improvements at Most Holy Redeemer Church in Detroit. The project included a buildout of the basement to create space for classrooms, restrooms and childcare. Our team performed electrical installation of power, lighting, and a dedicated fire alarm system required for a parishioner elevator, as well as removed existing electrical service panels to replace them with safe, serviceable and more modern electrical panels. Lastly, we performed an arc-flash study to ensure NFPA 70E compliance.