Connect with us

Talk to an expert   248.585.3400
EMERGENCY
810.533.5594

EMERGENCY
810.533.5594

MERIDIAN MAGNESIUM BUILDING REMEDIATION

Summary: On May 2, 2018 Meridian Magnesium experienced a catastrophic fire and explosion. While no lives were lost, 2 employees were injured, and their manufacturing process was destroyed. Walbridge and Ford Motor Company marshaled a global team of experts to remedy the immediate situation and rebuild the facility to resume manufacturing. SEGLC’s expertise in many […]

GM M5 PRODUCTION IMPROVEMENT PROJECT

Summary: This project was similar to the GM M5 Production Improvement in Flint, MI. There were (5) total sites – We engineered all 5 sites and were awarded the electrical for both of the sites we bid. At Fort Wayne, the project included expansion of the existing plant to include a North & South Logistics […]

GM M5 PRODUCTION IMPROVEMENT PROJECTS

Flint This project was an 850,000 sq. ft. body shop, constructed North of the existing GM Stamping Plant. The new facility was attached to the stamping plant via a connector building, as well as to the existing assembly plant by way of an overhead conveyor structure. The new body shop included a full administration office […]

GM FLINT FACTORY ONE

Summary: SEGLC performed extensive renovation of Durant-Dort Carriage Factory into what is now GM Flint Factory One. We provided a complete installation of power, lighting, security, IT technologies, and audio/visual systems. This project converted a 140-year-old former Carriage Factory into an architecturally diverse and high-tech museum/office/banquet center, all while maintaining the original look and feel […]