The Wallace Battery Cell Innovation Center expands General Motor’s battery cell operations and development. Superior Electric performed as the Design Build Electrical contractor performing design services to provide an electrical distribution that met the needs of the customer. Superior Electric was able to provide a flexible electrical distribution to meet the demands of an everchanging technology, providing the customer with a facility that will meet their needs not only today, but in the future. Utilizing Valued Engineering design principles and 3D BIM Coordination, Superior Electric was able to provide an electrical distribution that not only met the needs of the customer but also provided limited impact to the crucial floor space within the facility, while still providing flexibility for future expansion and changes within the building.