This Battery Assembly building and ASRS is a Design build project that we did with Walbridge for GM. We started this project in 2022 and is projected to be completed by July of 2025. This (2) Level Battery assembly is an expansion of the existing plant. We installed (2) substation rooms along with a network of power bus on both levels to deliver 480v (3) phase power to both levels for the facility and process equipment that we installed though out this building addition. We also expanded the plants fire alarm system to include all the building additions at the Lake Orion Assembly plant. The ASRS (Automatic Stacker Racking System) is a 130-foot-tall addition to the Battery Assembly plant and is designed to automatically file and store material or equipment for manufacturing the battery packs until needed for the assembly process. This is a fully automated system complete with a conveyance system that links the ASRS with the processing equipment on both levels.