Summary: This project was completed in 2020. The US Signal Data Center is a 25,000 SF facility with (2) UPS electrical rooms, (2) 2000KW generators, as well as (2) primary 1200amp switches having (2) separate utility feeds from Detroit Edison. In addition to an uninterrupted power system, the project also had a very high-level security system that included retina scanner and card access for entering and exiting the data center.