Connect with us

Talk to an expert   248.585.3400
EMERGENCY
810.533.5594

EMERGENCY
810.533.5594

GM M5 PRODUCTION IMPROVEMENT PROJECT

Year

2018

Category

Auto & Man

Sq. Feet

800,000

Location

Fort Wayne, Indiana

Service

Gen. Building & Dev. System

Project Overview

Summary: This project was similar to the GM M5 Production Improvement in Flint, MI. There were (5) total sites – We engineered all 5 sites and were awarded the electrical for both of the sites we bid. At Fort Wayne, the project included expansion of the existing plant to include a North & South Logistics center, General Assembly area and the largest body shop that GM has ever built to date. It also included all of the site electrical that included the additional site light poles around the new structures, added truck docks to the new structures as well as to the existing building, a new bottle storage area and a new bulk refrigerant system. All of this work was completed while that plant was still in production. We scheduled and planned outages when needed.

Related Projects

PENTHOUSE SUB

Automotive

GM DETROIT HAMTRAMCK FACTORY ZERO

Auto & Man

KROGER FULFILLMENT CENTER

Commercial

MOST HOLY REDEEMER DETROIT RENOVATION & IMPROVEMENTS

Institutional (Church)

Connect with us

CLOSE