Connect with us

Talk to an expert   248.585.3400
EMERGENCY
810.533.5594

EMERGENCY
810.533.5594

GM M5 PRODUCTION IMPROVEMENT PROJECT

Summary: This project was similar to the GM M5 Production Improvement in Flint, MI. There were (5) total sites – We engineered all 5 sites and were awarded the electrical for both of the sites we bid. At Fort Wayne, the project included expansion of the existing plant to include a North & South Logistics […]

GM M5 PRODUCTION IMPROVEMENT PROJECTS

This project was an 850,000 sq. ft. body shop, constructed North of the existing GM Stamping Plant. The new facility was attached to the stamping plant via a connector building, as well as to the existing assembly plant by way of an overhead conveyor structure. The new body shop included a full administration office with […]

GM FLINT FACTORY ONE

Summary: SEGLC performed extensive renovation of Durant-Dort Carriage Factory into what is now GM Flint Factory One. We provided a complete installation of power, lighting, security, IT technologies, and audio/visual systems. This project converted a 140-year-old former Carriage Factory into an architecturally diverse and high-tech museum/office/banquet center, all while maintaining the original look and feel […]

GM ENTERPRISE DATA CENTER – MILFORD PROVING GROUNDS

Summary: This project was issued as a bulletin to the Warren Data Center, as a true design-build project. This was a brand-new facility at the GM Milford Proving Grounds that required over 5 miles of primary cable and duct bank to feed the new location. This project ran concurrently with the Warren Data Center and […]

Connect with us

CLOSE