GM Orion BET #2 & ASRS
This Battery Assembly building and ASRS is a Design build project that we did with Walbridge for GM. We started this project in 2022 and is projected to be completed by July of 2025. This (2) Level Battery assembly is an expansion of the existing plant. We installed (2) substation rooms along with a network of power […]
General Motors Wallace Battery Cell Innovation Center
The Wallace Battery Cell Innovation Center expands General Motor’s battery cell operations and development. Superior Electric performed as the Design Build Electrical contractor performing design services to provide an electrical distribution that met the needs of the customer. Superior Electric was able to provide a flexible electrical distribution to meet the demands of an everchanging […]
The Design Center West Studio
The Design Center West Studio Building (DCWSB) is a new building, part of the Design Center Complex, which was designed in the 1950’s by Eero Saarinen. It is primarily two levels with three electrical penthouses. It has a central tunnel that connects to an existing tunnel system, which provides access to the adjacent Design Administration […]
U of M Clinical Inpatient Tower
Branch power on floors 1-7 in the new UofM Clinical Inpatient Tower on the Michigan Medical Campus. Required heavy BIM coordination amongst multiple other trades. Prefabbed substantial portions of the project to overcome schedule issues.