DTE SIBLEY QUARRY SITE IMPROVEMENTS

To begin this project, our team designed and built (2) Power Distribution Containers (PDC) in our prefabrication dept, with the help of our engineering team. The PDC’s distribute power to (4) 200HP pumps to control infiltration of ground water. The pumps are controlled with the latest in SCADA technology and can be operated remotely by phone or computer. The quarry is being filled with fly […]

US SIGNAL DATA CENTER

Summary: This project was completed in 2020.  The US Signal Data Center is a 25,000 SF facility with (2) UPS electrical rooms, (2) 2000KW generators, as well as (2) primary 1200amp switches having (2) separate utility feeds from Detroit Edison. In addition to an uninterrupted power system, the project also had a very high-level security system […]

BROSE NEW BOSTON EXPANSION

Summary: Brose is an automotive supplier with their headquarters located in Coburg, Germany. They produce components and systems for multiple automotive companies. This was a 180,000 square foot addition to their existing plant in New Boston, Michigan with a 100-foot tall, automated stacker addition. There was also site work that was done with new parking […]

MERIDIAN MAGNESIUM BUILDING REMEDIATION

Summary: On May 2, 2018 Meridian Magnesium experienced a catastrophic fire and explosion. While no lives were lost, 2 employees were injured, and their manufacturing process was destroyed. Walbridge and Ford Motor Company marshaled a global team of experts to remedy the immediate situation and rebuild the facility to resume manufacturing. SEGLC’s expertise in many […]