Connect with us

Talk to an expert   248.585.3400
EMERGENCY
810.533.5594

EMERGENCY
810.533.5594

GM DMAX BROOKEVILLE

This project was a 251,000 sq ft building built in 2020 to allow GM/DMAX to produce overflow parts for the Duramax Diesel engines they build jointly. The project included new primary service, (1) substation room with (4) power and lighting subs, (6) new 1600a bus feeds and complete 480v distribution systems, LED building lighting, sight lighting, […]

MERIDIAN MAGNESIUM BUILDING REMEDIATION

Summary: On May 2, 2018 Meridian Magnesium experienced a catastrophic fire and explosion. While no lives were lost, 2 employees were injured, and their manufacturing process was destroyed. Walbridge and Ford Motor Company marshaled a global team of experts to remedy the immediate situation and rebuild the facility to resume manufacturing. SEGLC’s expertise in many […]

GM M5 PRODUCTION IMPROVEMENT PROJECT

Summary: This project was similar to the GM M5 Production Improvement in Flint, MI. There were (5) total sites – We engineered all 5 sites and were awarded the electrical for both of the sites we bid. At Fort Wayne, the project included expansion of the existing plant to include a North & South Logistics […]

GM M5 PRODUCTION IMPROVEMENT PROJECTS

This project was an 850,000 sq. ft. body shop, constructed North of the existing GM Stamping Plant. The new facility was attached to the stamping plant via a connector building, as well as to the existing assembly plant by way of an overhead conveyor structure. The new body shop included a full administration office with […]

Connect with us

CLOSE